ARDEX take on Autumn Floods

Morphy Richards warehouse, South Yorkshire

ARDEX UK, the trusted name for fast track industrial toppings, were delighted to provide products that were ideal for the job, when they assisted one of their valued clients, national resin flooring contractors Fastrack Flooring Ltd.

Morphy Richards commissioned Fastrack Flooring to resurface the floor area of a 7,000m² industrial warehouse, used as the base for their packaging and distribution operation in Mexborough, South Yorkshire. The existing floor area was substantially damaged by 3ft of water during last Autumns floods, making a major floor resurfacing project a necessity. The five phase project was carefully planned to ensure a superior floor could be installed, with minimum disruption to the busy area. ARDEX SD-T Industrial Floor System was chosen because of previous successful installations where time and cost savings were made without sacrificing quality of finish.

ARDEX SD-T was pump applied to give a fluid, self levelling mortar, specifically developed for the rapid resurfacing and levelling of existing concrete floors, providing a hard, smooth, flat surface, which is resilient enough to accept heavy wheeled traffic, typical of industrial workshops and warehouses. ARDEX SD-T is the only system available incorporating ARDEX Rapidry Formula technology that chemically binds the mix water without evaporation, allowing further work, including the application of water-based systems such as epoxy paint coatings in as little as 6 hours.

Phil Shannon of Fastrack Flooring said "We are aware that ARDEX products are developed with the end user in mind, and as expected their products met the brief perfectly. By utilising the ARDEX SD-T Industrial Floor System we were able to complete this large project on time and on budget, with a finished result that both ourselves and Morphy Richards were thrilled with".

April 2001